Client Situation
A manufacturer of machined aluminium components for the aerospace industry struggled with profitability outside peak market cycles. The factory operated in a high-salary region, relied on aging and inefficient machinery, and had a complex material flow that increased costs and reduced competitiveness. To secure the long-term viability of the site, the company needed a modernized plant layout, a future-oriented machinery concept, and significantly improved flow efficiency.
Objective
Develop a new layout and machinery portfolio that would:
- Enable higher volumes within the existing building footprint
- Improve material flow and reduce waste
- Increase efficiency and quality
- Modernize the technological base with next-generation machining solutions
Approach & Implementation
1. Cross-Functional Diagnostic Phase
A dedicated project team was established to analyze the current situation:
- Mapping of the full material flow
- Assessment of machine condition, utilization, reliability, and capability
- Profitability review of the entire product portfolio
Products that were unprofitable, non-strategic, or required excessive manual work were identified and removed from the future manufacturing scope.
2. Future Technology & Machinery Concept
To define the technological direction:
- A structured study with major machinery suppliers was conducted
- Future machining technologies and automation options were evaluated
- A target concept for next-generation equipment was developed
In several workshops, machines to be removed, replaced, or newly acquired were identified. This created the foundation for a modern, capability-driven machine portfolio.
3. Plant Layout & Flow Optimization
Based on the new machinery concept:
- A redesigned factory layout was developed
- Material flow was simplified and aligned with Lean principles
- Automation concepts were integrated to reduce manual handling
- Space utilization was optimized to accommodate increased production volumes within the existing buildings
4. Investment & Implementation Roadmap
A comprehensive plan covering investments, timeline, and organizational adjustments was created.
This roadmap ensured a structured modernization process with minimal disruption to ongoing operations.
Outcome
- Clear modernization strategy for machines, layout, and automation
- Improved material flow and future-proof factory structure
- Reduced labor intensity and improved competitiveness in a high-salary environment
- Investment and implementation plan approved and ready for execution